After the last post I thought it was time to see if the turnout idea works in practice and not just theory.
With my 5 amp radio system in for repair I hooked up the Powercab and did a run by.
With all having performed well I thought it best that when my 5 amp system returns I have things ready for the installation.
I have commenced RJ12 cable construction and have made a few testing panels to ensure everything is wired correctly.
I then researched various sites and people concerning the finer side of the electrics. I felt I needed an Amp meter for checking the layouts load and also a volt meter for just in case.
I then wanted to break up the comms bus and the track bus, so with all that in mind I constructed a box to house it all.
I am of a firm beleaver that why all the wiring I do now is clear in my mind, that will not be the case in 10 years time if I have to trouble shoot. Everything has been labled and colour coded.
Now I just hope the layout will make it to 10!!
All has been set up, tested and working as it should. I now need to lay some more track so as to get a better run.
Happy modelling.
Darren